Tuesday, September 3, 2013

Current Projects in Motion

With birthdays and our massive annual Halloween party on the horizon, followed then by the holiday season.. I had an ACK moment about just how little time we have to do some of the things we've been "meaning to get around to".

1. New TV unit for the media room that incorporates more storage. We know what we want, how much it costs, and how much it will hold. It's just a question of getting out to IKEA and then assembling it and putting it into place. The storage will let us unload some of the overflow from DemonPrincess' room regarding toys that she only plays with out in that room, something desperately needed.

2. Moving the existing unit to our bedroom, which involves mass moving of furniture. Like every piece of furniture in this room. >.< We need the storage to make this room more functional - and we'll have to give up our dresser to make room for it.  That part is okay - what we need is shelf storage (which we'll gain), not so much drawer storage for clothing. Of course, since we'll be moving everything anyway..

3. Painting our bedroom, which is still the manila-paper color it was when we moved in 6 years ago. It has not aged well. We've decided on a lovely medium cool gray.

Doesn't seem insurmountable, but there's only so many days in the week that DH has off to do any of it (I can organize, but I can't do any of the heavy lifting or other things).

But the list doesn't stop there. That's just the top 3 I hope to get done before the party.

Also of note:

Fixing the drywall bonks, holes, and scrapes as well as repainting our master bathroom (since the shower rebuild last year that I'm still gripe-y about. I can't believe they don't fix those things as part of the job if they did the damage).

Getting a new master bathroom flooring laid (issues caused by what called for shower replacement in the first place). Getting a new vanity that DOES have drawers because we have zilch for functional storage in this area.

Ripping out the kids' vanity and putting in a smaller one so anyone larger than a gnome can use their toilet.

We still need a big couch downstairs for gathering and entertaining, or just that will hold my 6 foot + DemonSpawn and DemonHusband, plus one dog. We know that expense is going to be massive, so I envision that being put off for quite awhile.

Finishing the library conversion by adding a drybar to the wall that previously housed my desk. Necessary for many reasons, but the top one being that I need easier access to the supply of rum and other things. Especially since it won't be far from the coffee machine as well.

And then? Then there's refinishing the kitchen table that needs to happen, and other "smaller" projects.

What's on YOUR list? How do you decide which get priority? We decided on our top 3 for minimal expense and maximum return.  Those will cost about $300ish to do both rooms and greatly increase function; everything else on the list is going to cost much more and while functionality needs improvement in the other areas, is not as of as much of a bother on a daily basis.

No comments:

Post a Comment